Astra Zeneca Gawsworth Building

  • Gawsworth Building, Alderley House, Astrazeneca, Macclesfield, Stockport, SK10 2NA
  • Category: Roofing
  • Product: Elastaseal Z
  • Sector: Light Industry
  • Guarantee: 15 Years
  • Coverage Area: 500m2
Download PDF

Free Site Survey

1

Before the correct coating system could be specified, Tor Coatings carried out a comprehensive free survey of the site to ensure every aspect of the project was clearly understood and all defects were documented thoroughly.

Project Specification

2

Before the correct coating system could be specified, Tor Coatings carried out a comprehensive free survey of the site to ensure every aspect of the project was clearly understood and all defects were documented thoroughly.

Installation

3

Wash down the entire roof area with Tor WDA10 to remove dirt, grease, and surface contaminants, ensuring a clean substrate for coating. Inspect the roof thoroughly for areas of splitting, delamination, or other defects, and carry out any necessary remedial repairs. Prepare and repair all identified defects to create a sound and stable surface for coating. Apply an appropriate primer to any exposed or repaired areas as required by the manufacturer. Install the Elastaseal Z 20 system across the roof area, following the manufacturer’s application guidelines. Ensure seamless detailing around roof penetrations, upstands, and edges to create a fully watertight finish. Carry out a final inspection upon completion to confirm full coverage, correct detailing, and overall integrity of the waterproofing system.

Continued Support

4

The system will be backed up with a 20 year guarantee.

Sign up to our newsletter

Be the first to receive exclusive news, expert advice, competition details and more.
Stay up to date with Tor Coatings and sign up to receive our email newsletter below.

Sign up